{"id":21483,"date":"2026-10-21T16:15:42","date_gmt":"2026-10-21T14:15:42","guid":{"rendered":"https:\/\/brumlovka.cz\/?post_type=aktuality&#038;p=21483"},"modified":"2026-10-21T16:16:56","modified_gmt":"2026-10-21T14:16:56","slug":"emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","status":"publish","type":"aktuality","link":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","title":{"rendered":"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street"},"content":{"rendered":"<p><em>We would like to inform you about an ongoing emergency repair of a&nbsp;district heating pipeline on <strong>V\u00e1clava Sedl\u00e1\u010dka Street<\/strong>, in the section between the BETA and DELTA buildings. The affected infrastructure belongs to Pra\u017esk\u00e1 tepl\u00e1rensk\u00e1, a.s. and <strong>requires immediate repair<\/strong> to ensure the safe and reliable operation of the network.<\/em><\/p>\n<p><strong><em>Repair Works Update<\/em><\/strong><\/p>\n<ul>\n<li><em>On Monday, 20th October 2026, excavation works commenced in the adjacent green area, which had initially been identified as the likely location of the fault.<\/em><\/li>\n<li><em>During the afternoon, it was confirmed that the extent of the damage is greater than originally anticipated and that the repair will also require intervention within the roadway.<\/em><\/li>\n<li><em>As a&nbsp;result, works have been taking place in the centre traffic lane since today. The area remains accessible to vehicles, with traffic being directed around the worksite and appropriate traffic management measures in place.<\/em><\/li>\n<li><em>Depending on the progress of the repair works, activities may be moved between individual traffic lanes. Access will be maintained at all times via at least one lane, supported by temporary crossing structures where necessary.<\/em><\/li>\n<li><em>Should any restrictions to the pedestrian crossing become unavoidable, a&nbsp;safe alternative pedestrian route will be clearly marked.\u00a0<\/em><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><em>As the exact location and full extent of the damage continue to be assessed and refined, it is not currently possible to determine a&nbsp;definitive completion date for the repairs. Should more significant traffic restrictions become necessary, we will work closely with the contractor, Termonta, to schedule such works during weekends wherever technically possible.<\/em><\/p>\n<p><em>We trust that these essential repairs will be completed as swiftly as possible and with minimal disruption to your day-to-day operations. We kindly ask you to plan for possible delays when travelling through this area over the coming days and to follow the temporary traffic management measures in place.<\/em><\/p>\n","protected":false},"featured_media":21482,"template":"","class_list":["post-21483","aktuality","type-aktuality","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka\" \/>\n<meta property=\"og:description\" content=\"We would like to inform you about an ongoing emergency ...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street\" \/>\n<meta property=\"og:site_name\" content=\"Brumlovka\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-21T14:16:56+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/brumlovka.cz\/wp-content\/uploads\/2026\/10\/Oprava-Horkovodu-1024x512.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"512\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street\",\"url\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street\",\"name\":\"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/brumlovka.cz\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Oprava-Horkovodu.png\",\"datePublished\":\"2026-10-21T14:15:42+00:00\",\"dateModified\":\"2026-10-21T14:16:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage\",\"url\":\"https:\\\/\\\/brumlovka.cz\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Oprava-Horkovodu.png\",\"contentUrl\":\"https:\\\/\\\/brumlovka.cz\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Oprava-Horkovodu.png\",\"width\":1774,\"height\":887,\"caption\":\"Oprava horkovodu hav\u00e1rie\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\\\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/brumlovka.cz\\\/en\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\\\/\\\/brumlovka.cz\\\/en\\\/news\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/brumlovka.cz\\\/en#website\",\"url\":\"https:\\\/\\\/brumlovka.cz\\\/en\",\"name\":\"Brumlovka\",\"description\":\"Lokalita Brumlovka. V\u00edtejte\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/brumlovka.cz\\\/en?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","og_locale":"en_US","og_type":"article","og_title":"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka","og_description":"We would like to inform you about an ongoing emergency ...","og_url":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","og_site_name":"Brumlovka","article_modified_time":"2026-10-21T14:16:56+00:00","og_image":[{"width":1024,"height":512,"url":"https:\/\/brumlovka.cz\/wp-content\/uploads\/2026\/10\/Oprava-Horkovodu-1024x512.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","url":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street","name":"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street - Brumlovka","isPartOf":{"@id":"https:\/\/brumlovka.cz\/en#website"},"primaryImageOfPage":{"@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage"},"image":{"@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage"},"thumbnailUrl":"https:\/\/brumlovka.cz\/wp-content\/uploads\/2026\/10\/Oprava-Horkovodu.png","datePublished":"2026-10-21T14:15:42+00:00","dateModified":"2026-10-21T14:16:56+00:00","breadcrumb":{"@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#primaryimage","url":"https:\/\/brumlovka.cz\/wp-content\/uploads\/2026\/10\/Oprava-Horkovodu.png","contentUrl":"https:\/\/brumlovka.cz\/wp-content\/uploads\/2026\/10\/Oprava-Horkovodu.png","width":1774,"height":887,"caption":"Oprava horkovodu hav\u00e1rie"},{"@type":"BreadcrumbList","@id":"https:\/\/brumlovka.cz\/en\/news\/emergency-heating-pipeline-repair-on-vaclava-sedlacka-street#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/brumlovka.cz\/en"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/brumlovka.cz\/en\/news"},{"@type":"ListItem","position":3,"name":"Emergency Heating Pipeline Repair on V\u00e1clava Sedl\u00e1\u010dka Street"}]},{"@type":"WebSite","@id":"https:\/\/brumlovka.cz\/en#website","url":"https:\/\/brumlovka.cz\/en","name":"Brumlovka","description":"Lokalita Brumlovka. V\u00edtejte","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/brumlovka.cz\/en?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/brumlovka.cz\/en\/wp-json\/wp\/v2\/aktuality\/21483","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/brumlovka.cz\/en\/wp-json\/wp\/v2\/aktuality"}],"about":[{"href":"https:\/\/brumlovka.cz\/en\/wp-json\/wp\/v2\/types\/aktuality"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/brumlovka.cz\/en\/wp-json\/wp\/v2\/media\/21482"}],"wp:attachment":[{"href":"https:\/\/brumlovka.cz\/en\/wp-json\/wp\/v2\/media?parent=21483"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}